PDDL3 TimeConstraints Track

TPP

In this planning domain there are 30 problems (named by numbers on the x-axis). The problems not indicated are solved by no planner. In the quality plot, the plan metric has to be minimized.




Pipesworld

In this planning domain there are 20 problems (named by numbers on the x-axis). The problems not indicated are solved by no planner. In the quality plot, the plan metric has to be minimized.




Storage

In this planning domain there are 30 problems (named by numbers on the x-axis). The problems not indicated are solved by no planner. In the quality plot, the plan metric has to be minimized.




Trucks

In this planning domain there are 20 problems (named by numbers on the x-axis). In the quality plot, the plan metric has to be minimized.